Welcome to Daqing Automation - Your Trusted Industrial Partner in Zhengzhou
1 drag 2 double gun automatic feeding induction brazing project
Welding product introduction: 1. Welding workpiece: copper tube, etc. 2. Diameter range: 1.8-12.7mm, specific to the physical specifications of the workpiece; 3. Welding time: Comprehensive cycle time of 12 seconds, subject to the customer's final welding workpiece specifications and requirements
Dual station two axis automatic flame welding equipment project
Welding Product Introduction: 1. Air conditioner aluminum connecting pipe components: air conditioner copper flange and copper aluminum valve seat, etc. 2. Specifications: subject to the product drawings or physical drawings provided by the customer 3. Production cycle: workpiece welding efficiency of 60 pieces/hour (depending on product size)
Copper tube gas collection pipe straight flame welding project
Welding product introduction: 1. Gas collection pipe: welding copper and copper pipes; 2. Specification: Based on customer drawings or actual workpieces; 3. Welding time: The final welding time shall prevail;
Four groups of 24 workstations rotary flame welding project
Welding product introduction: 1. Three way: copper to copper 2. Diameter 6mm and 6.35mm3, welding time: subject to actual welding time
Six groups of 12 workstations rotary flame welding eye tube project
Welding Product Introduction: 1. Eye Tube: Copper to Copper 2. Welding Time: Production Cycle Processing takes less than 9 seconds to produce two pieces, with one equipment equipped with 1-2 operators
Branch splitter dual station induction brazing equipment project
Welding product introduction: 1. Pipe joint welding: Copper joint and copper tube. 2. Diameter range within 0-30mm, 30-60mm, 60-100mm, etc., subject to the actual specifications of the workpiece; 3. Welding time 8-14 seconds
3-hole distributor dual station induction brazing equipment project
Welding product introduction: 1. Distributor welding: 3 holes 2. Welding time: subject to the actual welding time of the workpiece (note: starting from the fixing of the pipe fittings to the cooling of the pipe fittings)
Four station rotary flame welding equipment
Welding Product Introduction: 1. Welding of automotive aluminum parts, based on the final welding workpiece drawing or sample. 2. Welding cycle based on actual welding time